"Lumus "did not charge for minor items if those items made the quality of construction better", they “went beyond the normal scope of services within the price”, and they "have a high standard of ethics, professionalism, and fairness."
![]() |
|
Olana proved to be the largest and most challenging climate control and fire protection system yet. Not only was this a 100% coverage system but also included 5 zone coverage. This property was designed with extra high ceilings, a tower reaching 50 to 60 feet, and stencil painted walls thus mandating the necessity of all piping being run under floor boards. In addition the tour schedule was never interrupted during the installation.