"All of the work by Lumus Construction was performed at a very high level of skill. The contractor has sought to preserve the maximum amount of the fabric possible, retaining the integrity of this historic structure. The contractor also was able to get a very high level of workmanship from his subcontractors."
![]() |
|
This project required all materials, labor and management to repair 133 perimeter units. All air piping and thermostats were replaced and control and isolation valves were added. This building houses the Federal Court and Federal Judges offices. Installation and renovations were to be done during normal business hours but requirements to keep the noise levels down had to strictly adhered to. This project was completed ahead of schedule and met with the approval of the owners.